Tianjin Urban Distributed Microgrid Demonstration


Project Period: October 2025

Location: Tianjin 


 

System Configuration

  • ● 145 kW / 261 kWh integrated liquid-cooled energy storage system
  • ● 145 kW PCS (Power Conversion System)
  • ● 20.65 kWp PV carport
  • ● 1 × 240 kW ultra-fast DC charging pile (1 × 600 A liquid-cooled terminal + 2 × 120 kW fast-charging dual-gun terminals)
  • ● 2 × 7 kW AC slow-charging terminals
  • ● Energy Management System (EMS): Achieves millisecond-level coordination between PV and energy storage; automatically optimizes the energy storage charge/discharge strategy.

Parameters

PV Capacity Approx. 20.65 kWp
Energy Storage Capacity 145 kW / 261 kWh
Annual Power Generation Approx. 27,829 kWh/year
Annual Coal Savings 9.13 tons/year
Annual CO₂ Reduction 13.22 tons/year
Vehicles Served 270 new energy vehicles with 750 km range
Annual Charging Pile Revenue CNY 75,438
Annual Peak-Valley Arbitrage Revenue CNY 73,200
PV Self-Consumption Revenue CNY 20,000
Additional Technological Innovation Revenue CNY 4,200/year
Annual Park Electricity Cost Savings CNY 70,000
PCS Full-Load Efficiency 99%
Service Life 8–12 years
Volume / Weight 50% volume reduction, 40% weight reduction
DC-Coupled System Efficiency >90% (conventional AC-coupled: only 85%)

*AI-enhanced images

Challenges & Solutions

Technical Challenge Solution
1.Difficulty in balancing system efficiency, power density, and dynamic response;
2.conventional solutions suffer from delayed response and imprecise energy dispatch; 3.conventional AC-coupled efficiency is only 85%
Full SiC (Silicon Carbide) PCS + MPPT design (system efficiency >90%, revenue increased by 4%)
DC-coupled architecture (only one conversion stage required, efficiency improved by 5–10%)
Self-developed coordination controller with millisecond-level response
AI-prediction-optimized charge/discharge strategy
PCS full-load efficiency of 99%, service life of 8–12 years

Application

  • Urban Distributed Microgrid, Solar-Storage-Charging Integrated Charging Station

Project Highlights

  • Technological Breakthrough: Full silicon carbide (SiC) devices combined with a DC-coupled architecture deliver significantly improved system efficiency
  • Multiple Revenue Streams: Stacked benefits from charging pile revenue, peak-valley arbitrage, and PV self-consumption
  • Cost Reduction & Efficiency Improvement: Reduces annual park electricity expenses by CNY 70,000 and improves energy utilization efficiency
  • Urban Demonstration: Provides a replicable technical template for the construction of new-type urban charging infrastructure