Guangdong 20–150kW Photovoltaic Power Station Project
Project Time: 2025
Location: Guangdong
System Configuration
- ● 20~150kW Grid-Tied PV Inverter
Parameters
| Annual Power Generation | Approx. 11 Million kWh |
| Annual CO₂ Reduction | 10,967 Tons |
| Inverter & Battery Configuration | 20~150kW Grid-Tied PV Inverter |
| Inverter Power Range | 20~150kW (Full Series, Multiple Models) |

*AI-enhanced images
Challenges & Solutions
| Technical Challenge | Solution |
|---|---|
| Customer places high value on the "stability" of inverters | 20~150kW inverters deliver efficient and stable power generation |
| High adaptability requirements under weak grid conditions | Excellent adaptability demonstrated under weak grid conditions |
| Demand for long-term stable power station operation | Ensures long-term stable operation and provides continuous, reliable green power |
Application
- Distributed PV on Industrial & Commercial Rooftops ; Rooftop PV for Furniture Manufacturers; Self-Consumption with Surplus Fed to Grid
Project Highlights
- Cost & Carbon Reduction: Lowers electricity costs through self-consumed PV power, with annual CO₂ reduction exceeding 10,000 tons
- Rooftop Resource Utilization: Built on idle factory rooftops with no additional land occupation
- High Weak-Grid Adaptability: Inverters deliver excellent performance under weak grid conditions, ensuring long-term stable operation
- Zero-Carbon Transition Model: Integrates PV with manufacturing concepts to set a benchmark for zero-carbon factories in the furniture industry
Cases
Contact Us
E-mail: info@onbipv.com
WeChat: +86 158 0002 4197
Whatsapp: +86 158 0002 4197











WhatsApp
Mail inquiry